NewThe mirror pool and the above-ground pool

Professional area

The steel structure for your pools.

Custom or standard steel panels, manufactured on a robotic production line for pool distributors and builders.

Beneath the water, a self-supporting steel structure.

The strength of steel, the freedom of custom design. Modular panels that put your expertise to work.

Precision in every detail.

Modular panels, adjustable support struts: a system designed to make assembly easier.

  • Modular steel panels : They join together and follow any pool shape.
  • U-channel reinforcements : Set in the middle of each panel, they add rigidity to the wall.
  • Adjustable support struts : At every joint, they take up the water pressure and align the wall.
  • Dark Protect+ : On Magnelis® steel, it protects every part, edges included.

Fast assembly, a structure built to last.

The technical sheet.

Detailed plans supplied with every order.

1 m1,50 m1,50 m12345Rear viewSide view1 Magnelis® steel panel + Dark Protect+2 U-channel reinforcement3 Adjustable support strut4 Threaded adjustment rod5 Base bracket
Material
Magnelis steel with protective coating
Protection
Dark Protect+ epoxy coating on every part, including the cut edges of the steel sheet
Panels
Modular, several sizes available, any cut possible on request. Flex panels for free-form shapes
Wall dimensions
Standard heights (cm): 107, 120, 131, 150, 170 and 200. Panel thickness: 2 mm
Reinforcement
Adjustable support struts to align the walls perfectly
Shapes
Rectangular (standard shape) or free-form thanks to flex panels
Installation
Inground, semi-inground or above-ground
Warranty
25 years
Packaging
On pallets

The steel coil

Magnelis® steel, sourced from a leading European manufacturer, uncoiled at the start of the line.

The workstation, as a diagram

Cutting and bending

Fully robotic, using cutting-edge technology.

The workstation, as a diagram

Dark Protect+ protection

Every part receives the Dark Protect+ coating, oven-cured at 280 °C, on all faces and edges.

The workstation, as a diagram

Packing and shipping

Packed on pallets, your panels are ready to ship, within France or abroad.

The workstation, as a diagram

The production line.

Steel, the best alternative to concrete.

Drag the handle to compare.Slide to compare.

Concrete

On site
Formwork, rebar, pouring, curing time.
Over time
Concrete moves with frost and the ground, and can crack.
Shapes
Every shape needs its own formwork: a complicated build.

Steel

On site
Ready-to-assemble panels, bolted together: no formwork, no curing time.
Over time
25-year warranty: a process proven for 50 years in Canada, from -40 °C to +40 °C.
Shapes
Flex panels follow any curve, with no formwork.

Let's work together!

Are you a pool builder or contractor? Join our partner network and grow your business with our innovative steel structures.

Become a Geko Pools distributor

Join our distributor network and offer your customers an innovative solution: Magnelis® steel pool structures, with our additional Dark Protect+ protection.

Magnelis® steel combined with Dark Protect+: a Geko Pools exclusive, and a selling point your competitors cannot offer.

  • Double protection for the steel

    Magnelis® steel combined with our exclusive Dark Protect+ treatment gives the panels lasting protection against corrosion.

  • Simple, fast assembly

    Preformed panels to assemble: less time spent on the structure, more projects in the season.

  • Made-to-measure projects

    Sizes, shapes and several heights: tailor your proposals to what your customers want.

  • A range that broadens your offer

    Inground, mirror or above-ground pools: new solutions to meet new demand.

Together, let's create new opportunities in the pool market.

06 47 59 10 79
contact@gekopools.com

Our commitment: enquiries from homeowners in your area are passed on to you. In regions where our network is not yet established, Soreva handles them directly.

Your details are only used to reply to your request. Privacy

Your questions.

Feel free to contact us for more information.

06 47 59 10 79contact@gekopools.com

Call us or send your request: you will receive our trade terms and support on your first projects.

From long experience in Canada: more than 50 years of success in extreme climates, from -40 °C to +40 °C, in Canada and the United States. The Dark Protect+ coating, applied to every face and edge of the 2 mm thick Magnelis® steel panels, gives them lasting protection against any chemical, salt or chlorine attack: the structure comes with a 25-year warranty. Watertightness is provided by a liner or a reinforced PVC membrane.

Yes. The assembly instructions supplied allow the pool to be sold as a kit. The modular system offers many custom shapes, with a choice of pool depth.

Both. Panels ship on pallets, as single units or in volume, ready to go into your projects.

Yes. Every structure is sized for its project, from private pools to public pools.

Yes. Our support includes the design study, the plans and training your teams in assembly.

Yes. The panels are treated against corrosion and designed to withstand ground stresses as well as temperature variations. The structure comes with a 25-year warranty.

Yes. Geko Pools delivers throughout France and worldwide.