Our story

Over 40 years
of experience.

Behind Geko Pools, there is a man, a career and more than four decades devoted to swimming pools. In the 1980s, Vladimir Prudik took his first steps in the pool industry, in Cavaillon. He gained solid experience of the trade, which today forms the foundation of Geko Pools and its commitment to professionals.

Steel coils, as they arrive at the factory
Steel coils, as they arrive at the factory
“The pool manufacturer taking on the American market”Vladimir Prudik in the press, before leaving for the pool show in Atlantic City.

ProfileGeko Pools

Who is Vladimir Prudik?

Active in the pool industry since the 1980s, Vladimir Prudik has built up several commercial and industrial companies in south-east France. Today, he runs Geko Pools.

Our process is superior.

Vladimir Prudik, in the press
1980s
First steps in the pool industry, in Cavaillon
South-East
6th-largest manufacturer in France
Today
Geko Pools
2027
Mirror and above-ground pools

He took his first steps in the pool business in Cavaillon. He then grew a company in south-east France into the country's 6th-largest manufacturer, trading notably under the Rhône Piscines and Point Bleu Piscines names.

Early on, he bet on a technique from North America: the steel-structure pool, proven for over 50 years in Canada and the United States, in climates ranging from -40 °C to +40 °C. He took this know-how all the way to the pool show in Atlantic City, as the press reported at the time.

With Geko Pools, he puts more than four decades of experience at the service of professionals: Magnelis® steel structures protected by Dark Protect+, in France and across Europe.

Vladimir Prudik, President of Geko Pools

Today

Geko Pools, building on that experience

Founded in 2024 and chaired by Vladimir Prudik, Geko Pools offers Magnelis® steel structures combined with Dark Protect+ protection, for the French and European markets. Its approach puts professionals' needs first: solutions tailored to their projects, and the freedom to buy structures without having to purchase a complete kit, so they can keep their own equipment and ways of working.

Steel2 mm panelsMagnelis®Zinc, aluminium, magnesiumDark Protect+Epoxy cured at 280 °C

25 yearswarranty

Geko PoolsOver 40 years of experience in pools, serving today's professionals.

Let's work together!

Pool builder, contractor or distributor: let's talk about your projects and our trade terms.